Payable Services

                                    (Revised SOR Rates for After Sales for PNG control Room Services effective from 16.11.20)
S. No. Activity Description  UOM         A
( Service Charge)
        B
(Material Cost )
      C
(Visit Charge)
     Amount        ( A+ B + C )  Remarks
1 Removal and Installation  of meter and copper tubig upto MCV Nos. 1000 0 200 1200 Removal : 400 , Installation:600, Visit charge for removal:100, Visit charge for installation:100
2 Removal of GI including MCV and refixing as in original Nos. 1000 0 200 1200 Removal : 400 , Installation:600, Visit charge for removal:100, Visit charge for installation:100
3 Additional laying of GI wothout any removal of GI including fitting of MCV inside kitchen
A 1/2″ Meters 400 0 100 500
B 3/4″ Meters 425 0 100 525
4 Addition/Alteration in  copper tubing  only . This activity invlolves only the copper tubing work on the downstream of Meter without requiring any removing of the meter ( 12 mm diaX 0.6mm Thickness) Meters 375 0 100 475
5 Visit charges for the above activity caused by non availability/ non readyness of the customer at decided time. Min Charges per visit to customer premises 0 0 100 100
6 Calibration Check of PNG meter, if requested by the customer Nos. 500 0 100 Actual incurred cost of calibration  + Rs. 600 1. Refundable in case of error found in meter.
2. Rs. 200 for new meter Instalaltion and removal of old meter
3. Rs. 100 Visit Charges
7 Tempering or damage in PNG Installation Nos. 5000 0 100 5100
8 Temperarory Disconnection of gas supply to customer Nos. 125 0 125 250
9 Permanent disconnection of gas supply to customer Nos. 125 0 125 250 A) Rs. 250 for only appliance valve removal and plug.
B) Dismentling of (GI pipe 3/4″, 1/2″ and Cu pipe)-Rs. 93 per meter+ Rs. 250
10 SOR for Valves and Fittings
A  Meter Control Valve ( MCV 3/4 “) Nos. 0 300 0 300
B  Union Connector ( 3/4 ” X 12 mm ) Nos. 0 300 0 300
C  Adaptor ( 1/2 ” X 12 mm ) Nos. 0 300 0 300
D SS  Appliance Valve Nos. 0 300 0 300
E Flexible Hose ( Ananconda) Nos. 0 300 0 300
F Copper Tee Nos. 0 300 0 300
G Any  other Copper Fitting Nos. 0 250 0 250
H Any  other GI Fitting Nos. 0 150 0 150
11 SOR for Rates for Attending Stove Burner and Rubber Tube Call outs
A Burner/Nozzle cleaning Each Burner 50 0 100 150
B Burner cleaning with caustic soda Each Burner 75 0 100 175
C Second Stove Conversion (SCV) ( In case of new stove purchased by the customer) Each Burner 50 0 100 150 Rs. 50 for each burner conversion
D SCV – Cooking Range Each Burner 300 0 100 400
E Casting Burner- Small Each Burner 150 0 100 250
F Casting Burner- Big Each Burner 200 0 100 300
G Brass Burner – Small Each Burner 200 0 100 300
H Spindle Change ( Port provided for connecting rubber tube ) Each Burner 100 0 100 200
I Cooking Range Knob Each Burner 50 0 100 150
J Knob Change Each Burner 50 0 100 150
K Gas Cock Valve Each Burner 150 0 100 250
L Conversion of Geyser to PNG Per Geyser 250 0 100 350
M Flame Problem  ( Free within 15 days of NG conversion) Each Burner 50 0 100 150
Remarks : For the SOR Items for SOR no. 11  applicable charges shall be(  Unit price X nos. of hotplate + Visit charge applicable for 01 time )
Geyser Connection With GI
12 For the Geyser connection , the rates of laying of GI shall be as per SOR Sr. no. 03 in addition to the fitting charges as  per SOR no. 9 (H) and SOR no. 10 ( L) 0 0 100  As mentioned in SOR no. 11 in addition to the visit charges
13 Meter Running Fast 500 0 100 600 Rs. 500 is refundable in case of meter is found running fast and meter to be changed free of cost. The same shall be cross verified through installation of another meter in series.
14 Emergency Call, leakage from GI,Copper any fitting , rubber tube , MDPE Free 0 Free
15 MDPE Pipeline Shifting
A 20 mm dia Meters 302 25 0 327 Remarks : 1. The said charges are applicable when the  trench is made available by the customer , if the same is not made available then a price of Rs. 500/- per day per manpower engaged shall be paid by customer
2. The Fitting Charges shall be extra at actual as per prevailing rates.
B 32 mm dia Meters 325 50 0 375
C 63 mm dia Meters 335 150 0 485
D 125 mm dia Meters 435 532 0 967
16 Steel Reinforced Rubber Tube  Replacement Nos. 0 100 100 200